A trade name is a starting point.
Electrical rows may distinguish inside, outside, low-voltage, line, traffic-signal, or other work. Do not collapse separate scopes into the first row containing “electrician.”
Tennessee · Davidson County · electrician · reviewed Jul 23, 2026
Upload the wage determination from the bid package or contract. The free preview reads that document and surfaces candidate classifications, base rates, fringes, footnotes, and mismatch questions.
Electrical rows may distinguish inside, outside, low-voltage, line, traffic-signal, or other work. Do not collapse separate scopes into the first row containing “electrician.”
For an awarded contract, start with the decision and modification incorporated into the contract. For a live bid, follow the solicitation and formal amendments. A newer SAM.gov result is not automatically a contract change.
Use the incorporated wage determination and formal amendments.
Match every location where covered construction work occurs.
Building, residential, highway, heavy, or supported multiple schedules.
Match the work performed and preserve identifiers, notes, and footnotes.
Retrieve general wage determinations from SAM.gov. DOL’s wage-determination guidance explains location, construction type, current determinations, modifications, and how to read the schedule.